Renovation Projects

Hotel Services, Inc. holds licenses in several states. Here are just some of the projects we’ve completed:


     

     

     

  

California

Embassy Suites

Renovation of guestrooms, outside corridors, public space including restaurant, bar, lobby and restrooms. Demolition of existing walkway and built new 50’ exterior ADA compliant bridge.


Embassy Suites

Complete interior renovation of 6 buildings. All suites converted to textured walls using 14 colors of paint and texture in each. All corridors, public spaces, restaurant, lobby, back of the house and gift shop were completely renovated.


Florida

Hilton Hotel

Complete exterior and interior renovation of this 300+ room hotel. Dramatic changes on the exterior and complete demolition of the entire first floor. New hospitality suites, 1400 sq ft fitness center and spa, new business center, boardroom, gift shop, new restaurant, lobby and public space, and rental car area, guest room corridors, lounge and concierge area.


Holiday Inn

Damaged by 2 hurricanes, this 503-room hotel was completely closed. Within 90 days half the hotel was open for guests. The remainder was open in another 45 days. This included interior, exterior, roofing, mold mildew remediation, and landscaping.


Holiday Inn Select

Major renovation of guest rooms, corridors, public restrooms and replacement of guest room entry doors.


DoubleTree

Major guest bath renovation. Corridor renovation included replacement of most metal framing. Mold and mildew remediation. New framing, insulation, drywall and vinyl wall covering.


Embassy Suites

Guest room renovation included complete demolition of suites including built in FF&E. All new texture and paint. New carpet. New granite covered bar. Extensive renovation of existing restaurant converting it to an Omaha Steak House. Public space included total demolition and installation of tile floor throughout complimentary breakfast area including FF&E, which was completed in 6 days.


Hilton Hotel

199 armoire conversions to allow installation of flat screen TV’s. Project completed in 7 days.


Crowne Plaza

200 armoire conversions to allow installation of flat screen TV’s. Project completed in 7 days.


Missouri

Embassy Suites

Complete renovation of all guest suites, corridors and handrails. Renovation of lobby ceiling 13 stories above the lobby floor.


New Jersey

Hilton Garden Inn

120 granite top armoire conversions to allow installation of flat screen TV’s. Project completed in 5 days.


Tennessee

DoubleTree

Complete renovation of 198 guest bathrooms including conversion of several baths to showers only. Project also included renovation of all corridors and main stairwell.


Hilton Hotel

192 granite top armoire conversions to allow installation of flat screen TV’s. Project completed in 7 days.